Skip to content

docs: Add network cleanup details during between tenant sanitization #2152

Description

@deepak-poornachandra

How would you describe the priority of this documentation request

Medium

Please provide a link or source to the relevant docs

https://docs.nvidia.com/infra-controller/v-0-8/documentation/overview/day-0-day-1-day-2-lifecycle#day-2--operations-health-and-tenant-transitions

Describe the problems in the documentation

NICo docs should add details about the network cleanup, during sanitization (between tenancy)

  1. Removing prior tenant network configuration from the DPU/host path
  2. Detaching the host from the tenant overlay/VPC
  3. Reverting the host to the admin or isolated network state
  4. Reconfiguring DHCP behavior on the DPU for the new lifecycle phase
  5. Withdrawing old routes / BGP-related configuration
  6. Ensuring unknown or released hosts cannot keep using network resources
  7. Preventing cross-tenant leakage of IPs, connectivity, or metadata

(Optional) Propose a correction

No response

Code of Conduct

  • I agree to follow NCX Infra Controller's Code of Conduct
  • I have searched the open documentation issues and have found no duplicates for this documentation issue

Metadata

Metadata

Assignees

Labels

No labels
No labels

Fields

No fields configured for Documentation.

Projects

Status
Verify

Milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions