Skip to content

Reconcile decision: fold gap inventory into roadmap phases 6-11+ #24

Description

@ssjoleary

Question

Fold the deduped gap inventory (resolved in the Master gap inventory ticket, #23) into the eca-cli roadmap: decide the reconciled phase structure and ordering for phases 6–11+.

Decisions to make:

  1. Correct the drift the baseline (Baseline: eca-cli currently-implemented protocol + UX surface #22) found, first: record that MCP integration (phase 7) and @-refs + jobs (phase 11) are already merged to main; fix the stale /sessions/chats command name in the status table.
  2. Place each gap row from Master gap inventory: upstream features missing from eca-cli #23 into a phase — existing (6/8/9/10 unbuilt; leftover 11 = /rollback + /fork) or a NEW phase where nothing fits.
  3. Order the phases: what ships next, what's deferred, what's cut. Factor rough size + dependency (e.g. markdown-ANSI render underpins several UX rows).
  4. Scope calls: confirm whether the editor-oriented rows (rewrite / inline completion / diagnostics) and GUI-bound image rendering are out-of-scope for a TUI.

Output: a reconciled phase list (phase → features), ordered, with drift-corrections named. This is the spec the issue-reconciliation ticket then maps #5–15 onto. Plan-only — does NOT edit roadmap.md.

Skills

Resolve HITL via /grill-with-docs (grounds the grilling in ../eca protocol docs + sibling-client source) plus /domain-modeling. Zoom into #23's resolution comment for the gap table.

Metadata

Metadata

Assignees

No one assigned

    Labels

    wayfinder:grillingWayfinder grilling ticket (HITL decision)

    Type

    No type

    Fields

    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions