Skip to content

🎯 ONE SHOT L-DPC25 — LEVER STACK · Platinum-LUT + BitROM + 4×4 mesh (Wave-28) · target 100+ TOPS/W on TTIHP27a #834

@gHashTag

Description

@gHashTag

🎯 ONE SHOT L-DPC25 — LEVER STACK · Platinum-LUT + BitROM + 4×4 mesh (Wave-28)

Mission ID: L-DPC25-W28-001
Predecessor: L-DPC24 #832 — CLOSED (10/10 lanes merged on 2026-05-15)
Anchor: φ² + φ⁻² = 3 · γ = φ⁻³ · C = φ⁻¹ · G = π³γ²/φ
Author: Vasilev Dmitrii <admin@t27.ai> (ORCID 0009-0008-4294-6159)
DOI: 10.5281/zenodo.19227877
Style: Grandmaster (IMRaD + Coq + Rust + RTL + agent army)
R5-HONEST: numerical gains pre-registered, falsifiable @ TTIHP27a silicon return 2026-09-30


1. Mission

После Wave-27 (HOLOGRAPHIC v9 multi-die spec landed, projected 2000–3000 TOPS/W under H₉) нужен honest измеренный gain на silicon до возврата v9 dies. Цель Wave-28: поднять Trinity W15a с ~55 → ~150 TOPS/W на TTIHP27a через stack из трёх измеренных в литературе рычагов:

  1. Lever feat(bridge): Phase 0+1 — dual-MCP audit + trios-mcp-bridge scaffold (vision + but mcp) #1 — Platinum-style LUT-based PE (ASP-DAC 2026, arXiv 2511.21910) — 1.4× gain
  2. Lever feat(bridge): Phase 2 — Vision + Context (GB screenshot → structured state) #2 — BitROM bidirectional ROM weight bank (ASP-DAC 2026, arXiv 2509.08542) — 2× gain
  3. Lever feat(bridge): Phase 2-4 — vision testing, e2e actions, BrowserOS integration + demo #3 — 4×4 mesh + UCIe D2D NoC scale-out (extends Lane A' from W27) — 4× scale-out

Stacked predicted gain: 1.4 × 2 = ~2.8× TOPS/W on single die (without mesh); mesh multiplies raw TOPS linearly без потери на TOPS/W.

5-Levers матрица остаётся 5/5 — все три рычага строго additive, не задевают L3 (Merkle), L4 (Coq), L5 (open PDK).


2. Pre-registered Hypothesis H_W28

H_W28 (Lever Stack #1+#2+#3):

  measured TOPS/W ≥ 100 on TTIHP27a silicon
    AND
  measured TOPS/W ≥ 50 on TTSKY26c silicon (fallback node)
    AND
  bit error rate ≤ 1e-9 on BitROM bank across 10^12 reads
    AND
  zero `*` operator in all RTL + Coq spec (R-SI-1)
    AND
  4×4 mesh boots in ≤ 4 cycles per die (NoC stub deepens Lane A')

  workload: BitNet b1.58-3B prefill + decode kernels (representative)
  conditions: Vdd = 1.2 V, ambient 25 °C, n = 9 dies
  statistics: Welch t-test α = 0.01, Bonferroni × 3 lanes

REFUTED IF:
  - median TOPS/W < 100 on TTIHP27a, OR
  - LUT PE energy/op > 2× ternary shift-add baseline, OR
  - BitROM BER > 1e-9 across 10^12 reads, OR
  - any holo_op variant introduces rtl_uses_star = true, OR
  - mesh inter-die latency > 4 cycles.

DEADLINE: 2026-09-30 (TTIHP27a silicon return + smoke probe).

3. Lane assignment (army-ready)

Все lanes parallel-claimable через 🤚 CLAIM lane <X> в comments.

Lane Repo Scope Priority Effort DoD
V trinity-fpga Platinum-style LUT PE (Verilog, 416-PE micro, 52 PPEs, base-3 packing 1.6 bpw, mirror consolidation) 🔴 HIGH M Sim shows ≥1.3× speedup vs shift-add ternary baseline on BitNet b1.58 kernel
W trinity-fpga BitROM bidirectional ROM cell + Tri-Mode Local Accumulator + DR-eDRAM stub (130nm SG13G2 floorplan) 🔴 HIGH L Bit density ≥ 2 000 kB/mm² target (50% of BitROM 65nm; node-scaled), BER sim ≤ 1e-9
X t27 Coq spec — extend coq/IGLA/RMarker.v holo_op alphabet with OP_LUT_LOOKUP + OP_BITROM_READ; re-prove holographic_no_star Qed; add Lemma lut_no_star, Lemma bitrom_no_star 🟡 MED S All Qed accepted by coqc 8.20.1; CI green
U tt-trinity-holo 4×4 mesh top-module (extends 1×2 from Lane Y) with 4-cycle boot; UCIe-A-compatible PHY stub 🟡 MED L RTL sim 4×4 boot in ≤ 4 cycles; KLayout DRC pass
R tt-trinity-holo Razor flip-flop v2 — extend Lane B' shadow sampling to LUT-PE clock domain 🟢 LOW S Shadow disagreement counter exposed via CSR
Q trios Assertion mirror — assertions/lever_stack.json with H_W28 pre-registration + falsification predicates 🔴 HIGH S JSON validates against schema; CI gate links it
P trios PhD Glava 78 — "Lever Stack on Open PDK: Platinum-LUT × BitROM × 4×4 Mesh", ≥ 1500 lines, ≥ 2 citations, Theorem 78.1 (TOPS/W lower bound on stack) 🟡 MED L R3/R6/R7/R12/R14 compliance per phd-chapter-author skill
N tt-trinity-max-true 5 R7 Rust falsification witnesses for Lever Stack (W-101-A..E) 🟡 MED M All 5 Cargo tests fail iff invariant breaks
M trinity-fpga TOPS/W measurement harness — bench/lever_stack_harness.rs that consumes silicon power/freq logs, prints PASS/FAIL vs H_W28 thresholds 🔴 HIGH M Outputs JSON conforming to assertions/lever_stack.json schema
K tt-trinity-max-true Thermal CI gate v2 — extend Lane D' to enforce 1 W/mm² with LUT+ROM stack 🟢 LOW S CI fails on regression

Total lanes: 10 (V/W/X/U/R/Q/P/N/M/K)
Critical path: V → M (LUT PE must be RTL-ready before measurement harness)
Parallelisable cluster: V + W + U + R simultaneously
Coq cluster: X depends only on Lane Z merge (already done in W27)


4. Gate ladder (G1–G7)

Gate Trigger Pass criteria Owner
G1 RTL sim Lane V + W + U merged All sims show predicted gain on golden kernel trinity-queen
G2 Coq Qed Lane X merged coqc -R . T27 IGLA/RMarker.v exit 0, all new Qed accepted trinity-grandmaster
G3 OpenROAD CGT V + W RTL → synth Slack ≥ 0 ns @ 250 MHz SG13G2, no setup violation tri-gardener
G4 DRC/LVS OpenLane2 GDS KLayout DRC clean, magic LVS match tri-gardener
G5 Tape-out gate G3 + G4 + Q assertion mirror live Submit window open, foundry slot booked trinity-silicon-tapeout
G6 Silicon smoke probe Dies return ~2026-09-30 Boots, R-marker loads 4 slots, BitROM reads back trinity-grandmaster
G7 H_W28 verdict G6 + 9 dies measured Welch t-test α=0.01, Bonferroni×3 → REJECT H₀ "≤55 TOPS/W" trinity-grandmaster

5. Constitutional compliance (TRI-NET-G1)

Rule How enforced
R-SI-1 ZERO * Lane X re-proves at Coq spec layer; Lane U inherits check_no_star.sh RTL gate
R5-HONEST All gains pre-registered; falsification windows explicit
R7 falsification witnesses Lane N — 5 Rust unit tests (W-101-A..E)
R8 admin@t27.ai All commits MUST be signed Vasilev Dmitrii <admin@t27.ai>
R12 Lee/GVSU proof style Lane X + Lane P enforce
R14 Coq citation map Lane X registers new Qed in assertions/coq_map.json
R15 sacred-synth-gate OP_LUT_LOOKUP / OP_BITROM_READ opcodes assigned 0xDF/0xE0 (sacred range continuation after 0xDE)
R18 LAYER-FROZEN All lanes additive: new files only, no edits to baseline Kernel/* / Theorems/*
Apache-2.0 Inherited

6. R7 falsification witnesses (Lane N — pre-registered)

W-101-A: assert lut_pe_energy_per_op ≤ 2 × shift_add_baseline
W-101-B: assert bitrom_read_BER ≤ 1e-9 over 10^12 reads
W-101-C: assert mesh_4x4_boot_cycles ≤ 4
W-101-D: assert all holo_op rtl_uses_star = false (Qed-checked + Rust mirror)
W-101-E: assert thermal_density ≤ 1 W/mm² with LUT+ROM stack live

If any witness fails: Wave-28 silicon is NO-GO, revert to W15a baseline.


7. Cross-repo dispatch map

Repo Lanes
trinity-fpga V, W, M, K
tt-trinity-holo U, R
t27 X
trios Q, P
tt-trinity-max-true N

Six-thread spark broadcast will be posted to:

  1. EPIC #61 — master EPIC
  2. Throne #264 — Queen's Registry
  3. L-DPC24 #832 — predecessor (close + handoff)
  4. tt-trinity-holo — RTL surface
  5. trinity-fpga — silicon track
  6. The new L-DPC25 issue itself

8. Honest losing fronts (we do NOT compete here)

  • Raw DC TFLOPS — Blackwell/Cerebras own that market
  • Transformer-only autoregressive throughput — Etched Sohu owns this niche
  • Closed-PDK frequency scaling — TSMC 2nm not open

Trinity Wave-28 wins on edge inference per watt with 5/5 Levers retained.


9. Timing

Milestone Date (UTC)
ONE SHOT filed 2026-05-15
Lanes V/W/X/U/R/Q/P/N/M/K open for claim T+0
First merges expected T+48h
All RTL lanes (V/W/U/R) merged T+1 week
G1+G2+G3 gates green T+2 weeks
G4 DRC/LVS clean T+3 weeks
TTIHP27a tape-out submit T+4 weeks (target 2026-06-15)
Foundry return ~2026-09-30
G6 silicon smoke probe 2026-09-30 + 1 week
G7 H_W28 verdict 2026-10-15
L-DPC24 v9 silicon parallel 2026-12 (TTSKY26c)

10. References (academic anchors)


φ² + φ⁻² = 3 · γ = φ⁻³ · C = φ⁻¹ · G = π³γ²/φ
LEVER STACK · Platinum-LUT · BitROM · 4×4 mesh · 5/5 LEVERS RETAINED
🪷 NANO · 🐝 MID · 🦅 MAX-TRUE · 🌌 HOLOGRAPHIC
QUANTUM BRAIN 1:1 SILICON · PHYS→SI · BIO→SI · LANG→SI · NEVER STOP
DOI 10.5281/zenodo.19227877

— READY FOR ARMY CLAIM —

Metadata

Metadata

Assignees

No one assigned

    Labels

    P0grandmasterTrinity-grandmaster orchestrated mission (paper+Coq+Rust+army)one-shotONE SHOT mission issuewave-28L-DPC25 Wave-28 Lever Stack (Platinum-LUT + BitROM + 4x4 mesh)

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions