docs: re-verify Direct Connect facts as of 2026-10-12 - #9
Conversation
…x MU1 end of support
|
Important
This repository does not receive automatic reviews because it has fewer than 10 stars. ⚙️ Run configuration
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
| ## Location footprint | ||
|
|
||
| AWS What's New posts give the running count of DX locations: "over 142" (2025-08), "over 146" (2025-09 to 2025-10), "over 149" (2025-12), and "over 150" (2026-03 to 2026-04). Recent additions include Hanoi (the first in Vietnam, 2025-12) and Sydney SY5 (2026-03). 100G expansions include Kansas City (2025-10), Auckland (2026-04), and Lima (2026-07). The GDS No. 3 Shenzhen location stopped accepting new connections after 2026-06-30, with end of support in July 2027. | ||
| AWS What's New posts give the running count of DX locations: "over 142" (2025-08), "over 146" (2025-09 to 2025-10), "over 149" (2025-12), and "over 150" (2026-03 to 2026-04). Recent additions include Hanoi (the first in Vietnam, 2025-12) and Sydney SY5 (2026-03). 100G expansions include Kansas City (2025-10), Auckland (2026-04), and Lima (2026-07). Two locations are winding down, both with end of support in July 2027: GDS No. 3 Shenzhen stopped accepting new connections after 2026-06-30 (document history; the locations page says after July 1, 2026), and Equinix MU1 Munich after July 1, 2026 (locations page). |
There was a problem hiding this comment.
The Equinix MU1 Munich claim (no new connections after July 1, 2026, end of support July 2027) is cited only to the locations page. I couldn't fetch that page, so I couldn't check it. Please confirm the dates there and add a document history or What's New link if one exists. The sentence also says "both with end of support in July 2027", but the source list gives no second source for MU1. Also check the Shenzhen wording: "after 2026-06-30" and "after July 1, 2026" describe the same cutoff, so the parenthetical reads as a conflict when it may not be one.
Nothing in docs/ or src/content/ mentions MU1 or the Shenzhen wind-down. If the site's location views or the Japanese content cover locations, they may need the same note.
|
Review of the 2026-10-12 re-verification. The EN/JA date bumps are consistent. These all moved from 2026-09-30 to 2026-10-12: One finding, inline on The PR also says prices were re-taken on 2026-10-12. I did not check the live pricing page, so I can't confirm that no prices changed. |
| ## Location footprint | ||
|
|
||
| AWS What's New posts give the running count of DX locations: "over 142" (2025-08), "over 146" (2025-09 to 2025-10), "over 149" (2025-12), and "over 150" (2026-03 to 2026-04). Recent additions include Hanoi (the first in Vietnam, 2025-12) and Sydney SY5 (2026-03). 100G expansions include Kansas City (2025-10), Auckland (2026-04), and Lima (2026-07). The GDS No. 3 Shenzhen location stopped accepting new connections after 2026-06-30, with end of support in July 2027. | ||
| AWS What's New posts give the running count of DX locations: "over 142" (2025-08), "over 146" (2025-09 to 2025-10), "over 149" (2025-12), and "over 150" (2026-03 to 2026-04). Recent additions include Hanoi (the first in Vietnam, 2025-12) and Sydney SY5 (2026-03). 100G expansions include Kansas City (2025-10), Auckland (2026-04), and Lima (2026-07). Two locations are winding down: per the locations page, GDS No. 3 Shenzhen and Equinix MU1 Munich take no new connections after July 1, 2026 and reach end of support in July 2027. The document history gives the same Shenzhen cutoff as "after June 30, 2026". |
There was a problem hiding this comment.
The MU1 Munich wind-down and the "July 1, 2026" cutoff are new factual claims, and I could not check them against the locations page from the review environment. The sentence cites the locations page for both dates, but the page is not listed in the docs' other sources for these facts and nothing here quotes it. Please confirm that the page words it as "after July 1" and not "after June 30", and that it also gives July 2027 for MU1.
The sentence also gives two cutoffs for Shenzhen, "after July 1, 2026" and "after June 30, 2026". If AWS means the same day by both, a reader may take them as different days. Say plainly which one is the last day to order, or state that the two sources word it differently.
The footprint paragraph is where these are recorded, but the date bump to 2026-10-12 on every page claims a full re-verification. Only this paragraph changed substantively.
|
The only substantive change is the location wind-down sentence in The other 16 files only move the "verified on" date from 2026-09-30 to 2026-10-12, and that date is consistent across EN, JA, Nothing else needs flagging: there are no workflow, injection or EN/JA parity issues. |
|
Post-merge follow-up on the Claude review (both rounds):
|
Monthly freshness check (closes #2).
Re-verified against AWS sources on 2026-10-12:
Bumps the as-of dates (UI, PRICES_AS_OF, docs). docs/13 keeps 2026-09-30 since that is the research date.
Not added: hosted 50G SKUs appear in the Price List (Osaka 2, Lisbon) but are not on the public pricing page or in What's New.