Repository navigation
test(integration): reconcile merged conformance gates and enforce them in CI - #36
Merged
Merged
Conversation
This was referenced Oct 19, 2026
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Combining #24–#34 leaves the conformance harness expecting the odd-length hex bug fixed by #33 and the ISNI URL gap fixed by #28. This follow-up reconciles those checks and runs the conformance, artifact-parity, provenance-test, and supply-chain-test gates in CI.
sameAsstill changes the anchor bytes and atom ID. The README records both inspected outputs; the reference expectation is unchanged.Validation on the combined tree: frozen install; build; typecheck; workspace tests; formatting/lint; schema and generated-file checks; supply-chain guard and 54 guard tests; artifact parity and 25 provenance tests; package registry; package dry-run; clean-room tarball smoke. Conformance: 1,027 pass, 23 TODO, zero failures. The first test run overlapped with packaging rebuilds and failed on missing generated files; after packaging completed, the sequential rerun passed. Local tools: Bun 1.3.11, Node 25.9.0; CI uses the repository-pinned Bun 1.3.3.
All eleven original child PRs were merged through GitHub with head-SHA checks and merge commits, preserving the dependency stacks. The resulting remote tree exactly matched the local integration tree before this follow-up. No package runtime code or oracle fixtures change here. PR #15 stays a draft; no npm publication or main-branch merge is included. New draft #35 appeared during integration and is outside this batch.