[RFP-04] Wada Global — Milestone 1 - #62
Conversation
|
|
||
| | # | Deliverable | Status | Link / Evidence | | ||
| |---|-------------|--------|-----------------| | ||
| | 1 | Complete Research Design Document | Complete | https://drive.google.com/file/d/1oBvAK0Le-O_r63BaHW-yLwHW6nvi-lZh/view?usp=sharing | |
There was a problem hiding this comment.
All Milestones and Deliverables should be included in the PR, not external links.
There was a problem hiding this comment.
Noted, this will be worked on.
There was a problem hiding this comment.
Review — Milestone 1, Research Design & Cross-Hub Alignment
Decision: Request changes.
Baseline requirement
All deliverables and evidence must be present in this PR as Markdown. External links to Google Drive, Google Forms, or any other external resource cannot be treated as evidence. If it is not in this PR as Markdown, it does not exist for the purposes of milestone review.
Issue 1 — All evidence is external (blocker)
Both deliverables link to external resources — a Google Drive PDF and a Google Forms survey. Neither is present in this PR as Markdown. The research design document must be written up as a Markdown file and committed here. The survey instrument must be reproduced as Markdown (questions, response options, structure). A Google Form link is not reviewable evidence.
Issue 2 — Three of four contracted deliverables are missing (blocker)
The contracted Milestone 1 deliverables are:
- Research design and methodology
- Cross-hub alignment plan
- Survey and interview instruments
- Sampling framework
The submission lists only two items: a research design document and a quantitative survey instrument. The cross-hub alignment plan is absent. The interview instruments are absent (the survey is one instrument; the interview guide is separate and also contracted). The sampling framework is absent.
Three of four contracted deliverables are not present in any form.
Issue 3 — No acceptance criteria mapping (blocker)
The acceptance criteria require that all artefacts are "adequately documented, reviewed and aligned across all hubs." There is no section in this report demonstrating that the instruments were reviewed, that the cross-hub alignment process occurred, or that the methodology was confirmed as appropriate across Nigeria, Kenya, and Ghana specifically. This needs to be addressed explicitly.
Issue 4 — Template boilerplate left in the document
The deliverables section still contains the template prompt text: "List every deliverable committed to in your grant agreement for this milestone." This must be removed before submission.
|
Thanks for reviewing and raising these issues. |
The milestone report has been updated to cover all the raised issues after review. All deliverables have been added as markdown files and properly referenced in the report.
… Notes by Gemini.md This document is our response to issue 3 – mapping the evidence to the acceptance criteria.
|
Update on the review remarks.
|
Submitting an MAF for Milestone 1 of our research project.