Skip to content
Open
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
2 changes: 1 addition & 1 deletion submissions/aadyant-sood/level-5/answers.md
Original file line number Diff line number Diff line change
Expand Up @@ -30,7 +30,7 @@ This factory production system is highly interconnected: projects produce differ
- `HAS_CERTIFICATION`
- `HAS_CAPACITY {deficit, overtime}`

This schema captures both operational production flow and workforce planning while keeping the graph practical for analytics, scheduling, and dashboard queries.
This schema captures both operational production flow and workforce planning while keeping the graph practical for analytics, scheduling, and dashboard queries

---

Expand Down
2 changes: 1 addition & 1 deletion submissions/aadyant-sood/level-5/schema.md
Original file line number Diff line number Diff line change
@@ -1,6 +1,6 @@
# Factory Knowledge Graph Schema

> Swedish steel fabrication production planning knowledge graph
> Swedish steel fabrication production planning knowledge graph.
> Stack: Neo4j AuraDB · Python · Streamlit

```mermaid
Expand Down
Binary file modified submissions/aadyant-sood/level-5/schema.png
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
Loading