Skip to content

Progress dashboard: 2026-09-05 evening refresh (C′ landed; S′ dispatched; referee questions; figure corrections; Plan A rev 11 merged) - #425

Merged
MaxGhenis merged 2 commits into
masterfrom
dashboard-0905eve
Sep 5, 2026
Merged

Progress dashboard: 2026-09-05 evening refresh (C′ landed; S′ dispatched; referee questions; figure corrections; Plan A rev 11 merged)#425
MaxGhenis merged 2 commits into
masterfrom
dashboard-0905eve

Conversation

@MaxGhenis

Copy link
Copy Markdown
Contributor

Evening milestone refresh of docs/progress/progress.json (+ regenerated docs/progress.md). Arms unchanged (purpose 20,815/20,815; Q5 63/257).

Milestone text, every sentence verified from bytes by the ceremony lane on 2026-09-05:

  • A4 re-freeze: first candidate failed the pinned battery at the scratch state; C′ (820da19) differs only in the extended test and its capture row; §34 digest unchanged and reproduced with the parent's projection code; batteries 220/220 at C′ and at the throwaway scratch; S′ dispatched 18:01 EDT.
  • Prose review: seven removed sentences and at least twelve added law-shaped sentences, reproduced by a second party, carried to the referees as questions.
  • Kit r8b installed (whole-document diff both directions, stated splitter parameters, source-byte probes, candidate-agnostic guard).
  • Decision-package corrections: MEASURED-family population 79 lines (not 78); tag-id unit 126 under its author's rule (not 127); the errata's "largest unswept surface" swept (185 spans, zero mid-clause truncations).
  • Graph: Plan A revision 11 merged (docs/plans: graph-port Plan A revision 5 (folds the third gate's round-2 findings) #424); first build slice running on a Claude lane with no escalation.

🤖 Generated with Claude Code

…nd asserted; S′ dispatched; seven removed / twelve added sentences to the referees; 79-line and 126-id corrections; Plan A rev 11 merged, build running; kit r8b)
@vercel

vercel Bot commented Sep 5, 2026

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
social-security-model Ready Ready Preview Sep 5, 2026 10:15pm UTC

Request Review

…ound; 19.0% composite union) and the closure of both errata-named Q5 surfaces
@MaxGhenis
MaxGhenis merged commit 855bbfc into master Sep 5, 2026
10 checks passed
@MaxGhenis
MaxGhenis deleted the dashboard-0905eve branch September 5, 2026 22:55
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant