Skip to content

[49581] First Financial Bank - Regression: Parent task hangs on “Getting the next task” when next step is a PM Block with Self-Service group assignment#1898

Open
marcoAntonioNina wants to merge 2 commits intodevelopfrom
bugfix/FOUR-29254
Open

[49581] First Financial Bank - Regression: Parent task hangs on “Getting the next task” when next step is a PM Block with Self-Service group assignment#1898
marcoAntonioNina wants to merge 2 commits intodevelopfrom
bugfix/FOUR-29254

Conversation

@marcoAntonioNina
Copy link
Contributor

@marcoAntonioNina marcoAntonioNina commented Feb 19, 2026

Issue & Reproduction Steps

The steps are on the ticket.
Expected behavior:
The shunt should pass correctly.
Actual behavior:
The task derivation remains in the interstitial space

Solution

  • Refactor task redirection logic to improve clarity and ensure correct handling of user assignments and element destinations

How to Test

Review the specific use case.
Review the different routings in the self-service case.

Related Tickets & Packages

Code Review Checklist

  • I have pulled this code locally and tested it on my instance, along with any associated packages.
  • This code adheres to ProcessMaker Coding Guidelines.
  • This code includes a unit test or an E2E test that tests its functionality, or is covered by an existing test.
  • This solution fixes the bug reported in the original ticket.
  • This solution does not alter the expected output of a component in a way that would break existing Processes.
  • This solution does not implement any breaking changes that would invalidate documentation or cause existing Processes to fail.
  • This solution has been tested with enterprise packages that rely on its functionality and does not introduce bugs in those packages.
  • This code does not duplicate functionality that already exists in the framework or in ProcessMaker.
  • This ticket conforms to the PRD associated with this part of ProcessMaker.

ci:deploy

… handling of user assignments and element destinations
@cypress
Copy link

cypress bot commented Feb 19, 2026

screen-builder    Run #2206

Run Properties:  status check passed Passed #2206  •  git commit b7d6ad4622: [49581] First Financial Bank - Regression: Parent task hangs on “Getting the nex...
Project screen-builder
Branch Review bugfix/FOUR-29254
Run status status check passed Passed #2206
Run duration 43m 55s
Commit git commit b7d6ad4622: [49581] First Financial Bank - Regression: Parent task hangs on “Getting the nex...
Committer Marco Antonio Nina Mena
View all properties for this run ↗︎

Test results
Tests that failed  Failures 0
Tests that were flaky  Flaky 0
Tests that did not run due to a developer annotating a test with .skip  Pending 19
Tests that did not run due to a failure in a mocha hook  Skipped 0
Tests that passed  Passing 389
View all changes introduced in this branch ↗︎

@processmaker-sonarqube
Copy link

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant

Comments