Conversation
📝 WalkthroughWalkthroughTwo straightforward additions: a new networking solution text file documenting a fork implementation, and an update to the README main heading to reflect a 100-day program scope instead of 90 days. Changes
Estimated code review effort🎯 1 (Trivial) | ⏱️ ~3 minutes Poem
🚥 Pre-merge checks | ✅ 2 | ❌ 1❌ Failed checks (1 inconclusive)
✅ Passed checks (2 passed)
✏️ Tip: You can configure your own custom pre-merge checks in the settings. Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
There was a problem hiding this comment.
Actionable comments posted: 0
Caution
Some comments are outside the diff and can’t be posted inline due to platform limitations.
⚠️ Outside diff range comments (1)
README.md (1)
1-5: Align the description with the new “100Days” heading.Line 5 still says “90-day journey,” which contradicts the updated title. Please update the body text to avoid confusing readers.
Summary by CodeRabbit
✏️ Tip: You can customize this high-level summary in your review settings.