Repository navigation
chore: complete spec 062 after verification - #322
Conversation
There was a problem hiding this comment.
PR Review Summary
No changes to review — this PR only moves specs/in-progress/062-goal-topic-phase-set.md → specs/completed/062-goal-topic-phase-set.md, a metadata-only change that marks the spec as completed after verification. No code, no functional changes.
{
"verdict": "approve",
"summary": "Chore PR moves a completed spec from in-progress to completed. No code changes, no functional impact.",
"comments": [],
"concerns_addressed": []
}There was a problem hiding this comment.
This is a docs-only change: moving a spec from in-progress to completed with status and timestamp updates. The concern in the plan is about timestamp correctness.
Let me verify the timestamps are sequential:
approved: "2026-10-20T10:46:01Z"✓generating: "2026-10-20T10:51:08Z"✓ (after approved)prompted: "2026-10-20T10:51:08Z"✓ (same as generating, expected)verifying: "2026-10-20T11:00:34Z"✓ (after prompted)completed: "2026-10-20T12:00:07Z"✓ (after verifying)
All sequential. The file rename is correct (in-progress → completed). No issues found.
Step 5: Consolidated Report
Must Fix (Critical): None.
Should Fix (Important): None.
Nice to Have (Optional): None.
Selector Mode Traceability: Mechanical funnel ran over 1 changed file (specs/completed/062-goal-topic-phase-set.md). ast-grep findings: 0. Judgment rules triggered: 0. Adjudication: trivial doc-status change — no correctness, security, or architectural concerns applicable.
Verdict: approve — the change is a correct spec-status transition with properly sequential timestamps, confined to documentation.
{
"verdict": "approve",
"summary": "Trivial spec-status transition: file renamed from in-progress to completed with correct status field and sequential timestamps. No code changes.",
"comments": [],
"concerns_addressed": [
{
"concern": "correctness: spec status updated from verifying to completed; timestamps are sequential",
"disposition": "addressed",
"detail": "verified: status field correctly set to completed, completed timestamp 12:00:07 follows verifying timestamp 11:00:34, all timestamps sequential"
}
]
}
Moves
specs/in-progress/062-goal-topic-phase-set.mdtospecs/completed/withstatus: completedafter its acceptance criteria were verified against released vault-cli v0.175.0.Evidence is recorded on the task page [[Goal and Topic Phase Validation Accepts Exactly the Task Phase Set and Names It]]: both probes pass against the installed v0.175.0 binary, and the release scenario gate passed.