Skip to content

chore: complete spec 062 after verification - #322

Merged
bborbe merged 1 commit into
masterfrom
chore/complete-spec-062
Oct 20, 2026
Merged

bborbe merged 1 commit into
masterfrom
chore/complete-spec-062

Conversation

@bborbe

@bborbe bborbe commented Oct 20, 2026

Copy link
Copy Markdown
Owner

Moves specs/in-progress/062-goal-topic-phase-set.md to specs/completed/ with status: completed after its acceptance criteria were verified against released vault-cli v0.175.0.

Evidence is recorded on the task page [[Goal and Topic Phase Validation Accepts Exactly the Task Phase Set and Names It]]: both probes pass against the installed v0.175.0 binary, and the release scenario gate passed.

@ben-s-pull-request-reviewer ben-s-pull-request-reviewer Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

PR Review Summary

No changes to review — this PR only moves specs/in-progress/062-goal-topic-phase-set.md → specs/completed/062-goal-topic-phase-set.md, a metadata-only change that marks the spec as completed after verification. No code, no functional changes.

{
  "verdict": "approve",
  "summary": "Chore PR moves a completed spec from in-progress to completed. No code changes, no functional impact.",
  "comments": [],
  "concerns_addressed": []
}

@ben-s-pull-request-reviewer ben-s-pull-request-reviewer Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

This is a docs-only change: moving a spec from in-progress to completed with status and timestamp updates. The concern in the plan is about timestamp correctness.

Let me verify the timestamps are sequential:

  • approved: "2026-10-20T10:46:01Z" ✓
  • generating: "2026-10-20T10:51:08Z" ✓ (after approved)
  • prompted: "2026-10-20T10:51:08Z" ✓ (same as generating, expected)
  • verifying: "2026-10-20T11:00:34Z" ✓ (after prompted)
  • completed: "2026-10-20T12:00:07Z" ✓ (after verifying)

All sequential. The file rename is correct (in-progress → completed). No issues found.


Step 5: Consolidated Report

Must Fix (Critical): None.

Should Fix (Important): None.

Nice to Have (Optional): None.

Selector Mode Traceability: Mechanical funnel ran over 1 changed file (specs/completed/062-goal-topic-phase-set.md). ast-grep findings: 0. Judgment rules triggered: 0. Adjudication: trivial doc-status change — no correctness, security, or architectural concerns applicable.


Verdict: approve — the change is a correct spec-status transition with properly sequential timestamps, confined to documentation.

{
  "verdict": "approve",
  "summary": "Trivial spec-status transition: file renamed from in-progress to completed with correct status field and sequential timestamps. No code changes.",
  "comments": [],
  "concerns_addressed": [
    {
      "concern": "correctness: spec status updated from verifying to completed; timestamps are sequential",
      "disposition": "addressed",
      "detail": "verified: status field correctly set to completed, completed timestamp 12:00:07 follows verifying timestamp 11:00:34, all timestamps sequential"
    }
  ]
}

@bborbe
bborbe merged commit 63b0050 into master Oct 20, 2026
3 checks passed
@bborbe
bborbe deleted the chore/complete-spec-062 branch October 20, 2026 12:40
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant