Skip to content

DAOS-18614 cart: Fix UCX provider init for re-init of daos client.#18200

Open
jgmoore-or wants to merge 2 commits intorelease/2.6from
jgm/DAOS-18624-2.6
Open

DAOS-18614 cart: Fix UCX provider init for re-init of daos client.#18200
jgmoore-or wants to merge 2 commits intorelease/2.6from
jgm/DAOS-18624-2.6

Conversation

@jgmoore-or
Copy link
Copy Markdown
Contributor

Steps for the author:

  • Commit message follows the guidelines.
  • Appropriate Features or Test-tag pragmas were used.
  • Appropriate Functional Test Stages were run.
  • At least two positive code reviews including at least one code owner from each category referenced in the PR.
  • Testing is complete. If necessary, forced-landing label added and a reason added in a comment.

After all prior steps are complete:

  • Gatekeeper requested (daos-gatekeeper added as a reviewer).

@jgmoore-or jgmoore-or requested review from a team as code owners May 7, 2026 17:44
@jgmoore-or jgmoore-or changed the title DAOS-18614 cart: Fix UCX provider init for re-init of daos client. DAOS-18624 cart: Fix UCX provider init for re-init of daos client. May 7, 2026
@jgmoore-or jgmoore-or changed the title DAOS-18624 cart: Fix UCX provider init for re-init of daos client. DAOS-18614 cart: Fix UCX provider init for re-init of daos client. May 7, 2026
@daosbuild3
Copy link
Copy Markdown
Collaborator

@daosbuild3
Copy link
Copy Markdown
Collaborator

@github-actions
Copy link
Copy Markdown

github-actions Bot commented May 7, 2026

Ticket title is 'daos_test/suite.py pool test (daos_test -p) fails for ucx+dc_x.'
Status is 'Awaiting backport'
Job should run at elevated priority (1)
https://daosio.atlassian.net/browse/DAOS-18614

@github-actions github-actions Bot added the priority Ticket has high priority (automatically managed) label May 7, 2026
@daosbuild3
Copy link
Copy Markdown
Collaborator

@daosbuild3
Copy link
Copy Markdown
Collaborator

@daosbuild3
Copy link
Copy Markdown
Collaborator

Test stage Test RPMs on EL 8.6 completed with status FAILURE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net/job/daos-stack/job/daos/job/PR-18200/1/display/redirect

@daosbuild3
Copy link
Copy Markdown
Collaborator

Test stage Functional on EL 8.8 completed with status FAILURE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net/job/daos-stack/job/daos/job/PR-18200/1/display/redirect

1 similar comment
@daosbuild3
Copy link
Copy Markdown
Collaborator

Test stage Functional on EL 8.8 completed with status FAILURE. https://jenkins-3.daos.hpc.amslabs.hpecorp.net/job/daos-stack/job/daos/job/PR-18200/1/display/redirect

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

priority Ticket has high priority (automatically managed)

Development

Successfully merging this pull request may close these issues.

2 participants