XY-875 Align loop engineering docs and skills - #295
Merged
Conversation
…nd skills","authority":"XY-875"}
…dance","authority":"XY-875"}
…ill guidance","authority":"XY-875"}
Member
Author
|
Manual Decodex Review recovery evidence for XY-875 at head 6d532c0:\n\n- Fresh-context/read-only review findings R1/R2 were repaired.\n- Follow-up finding R3 on guardrail recovery skill wording was repaired and rechecked clean.\n- Local validation: cargo make fmt; cargo make test (1035 passed, 1 skipped); git diff --check.\n- GitHub checks: CodeQL / Analyze actions / JS-TS / Python / Rust green.\n\nDecodex status classifies the lane as ready_to_land for PR #295. |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Validation
Recovery note
The retained XY-875 lane reached docs/skills patch + partial verification, then the app-server thread entered systemError/usageLimitExceeded before terminal handoff. I preserved the retained worktree, reviewed the diff, completed validation manually, and created this PR from the lane branch.