Skip to content

SPLAT-2629: AWS/mtu: fix upi-installer img to pipeline#74520

Merged
openshift-merge-bot[bot] merged 1 commit intoopenshift:masterfrom
mtulio:SPLAT-2629
Feb 6, 2026
Merged

SPLAT-2629: AWS/mtu: fix upi-installer img to pipeline#74520
openshift-merge-bot[bot] merged 1 commit intoopenshift:masterfrom
mtulio:SPLAT-2629

Conversation

@mtulio
Copy link
Contributor

@mtulio mtulio commented Feb 6, 2026

Fix the upi-installer reference to use the one from pipeline, preventing failures in jobs using the step with this ref, such as: https://prow.ci.openshift.org/view/gs/test-platform-results/logs/periodic-ci-openshift-release-master-nightly-4.22-e2e-aws-overlay-mtu-ovn-5000/2017750390128250880#1:build-log.txt%3A63

@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Feb 6, 2026
@openshift-ci-robot
Copy link
Contributor

openshift-ci-robot commented Feb 6, 2026

@mtulio: This pull request references SPLAT-2629 which is a valid jira issue.

Warning: The referenced jira issue has an invalid target version for the target branch this PR targets: expected the task to target the "4.22.0" version, but no target version was set.

Details

In response to this:

Fix the upi-installer reference to use the one from pipeline, preventing failures in jobs using the step with this ref, such as: https://prow.ci.openshift.org/view/gs/test-platform-results/logs/periodic-ci-openshift-release-master-nightly-4.22-e2e-aws-overlay-mtu-ovn-5000/2017750390128250880#1:build-log.txt%3A63

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@mtulio
Copy link
Contributor Author

mtulio commented Feb 6, 2026

/pj-rehearse periodic-ci-openshift-release-master-nightly-4.22-e2e-aws-overlay-mtu-ovn-5000

@jcpowermac
Copy link
Contributor

/lgtm

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Feb 6, 2026
@openshift-ci-robot
Copy link
Contributor

@mtulio: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@mtulio
Copy link
Contributor Author

mtulio commented Feb 6, 2026

The goal of this PR has been achieved: fix the pre-step with correct image.

Step executed successfully:

https://gcsweb-ci.apps.ci.l2s4.p1.openshiftapps.com/gcs/test-platform-results/pr-logs/pull/openshift_release/74520/rehearse-74520-periodic-ci-openshift-release-master-nightly-4.22-e2e-aws-overlay-mtu-ovn-5000/2019773164183097344/artifacts/e2e-aws-overlay-mtu-ovn-5000/network-conf-aws-cluster-mtu/build-log.txt

The failure in rehearsal is unrelated:

: [sig-apps][Feature:DeploymentConfig] deploymentconfigs won't deploy RC with unresolved images when patched with empty image [apigroup:apps.openshift.io] [Suite:openshift/conformance/parallel] 

@mtulio
Copy link
Contributor Author

mtulio commented Feb 6, 2026

/verified by #74520 (comment)

@mtulio
Copy link
Contributor Author

mtulio commented Feb 6, 2026

/pj-rehearse ack

@openshift-ci-robot openshift-ci-robot added the verified Signifies that the PR passed pre-merge verification criteria label Feb 6, 2026
@openshift-ci-robot
Copy link
Contributor

@mtulio: This PR has been marked as verified by https://github.com/openshift/release/pull/74520#issuecomment-3862269452.

Details

In response to this:

/verified by #74520 (comment)

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot
Copy link
Contributor

@mtulio: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot openshift-ci-robot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Feb 6, 2026
@mtulio
Copy link
Contributor Author

mtulio commented Feb 6, 2026

/pj-rehearse periodic-ci-openshift-release-master-nightly-4.22-e2e-aws-overlay-mtu-ovn-5000

@openshift-ci-robot
Copy link
Contributor

@mtulio: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@xueqzhan
Copy link
Contributor

xueqzhan commented Feb 6, 2026

/approve

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Feb 6, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: jcpowermac, mtulio, xueqzhan

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Feb 6, 2026
@openshift-merge-bot openshift-merge-bot bot merged commit 76de53a into openshift:master Feb 6, 2026
10 of 11 checks passed
@mtulio mtulio deleted the SPLAT-2629 branch February 6, 2026 22:39
Sau1506mya pushed a commit to Sau1506mya/release that referenced this pull request Feb 9, 2026
mohit-sheth pushed a commit to mohit-sheth/release that referenced this pull request Feb 9, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged verified Signifies that the PR passed pre-merge verification criteria

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants