Update Konflux references #473
Merged
Red Hat Konflux / Red Hat Konflux / greenwave-on-pull-request
succeeded
May 2, 2026 in 3m 50s
Success
Red Hat Konflux/greenwave-on-pull-request has successfully validated your commit.
Details
- Namespace: exd-sp-rhel-wf-tenant
- PipelineRun: greenwave-on-pull-request-9phjm
Task Statuses:
| Status | Duration | Name |
|---|---|---|
| 🟢 Succeeded | 4 seconds | |
| 🟢 Succeeded | 7 seconds | |
| 🟢 Succeeded | 9 seconds | |
| 🟢 Succeeded | 2 minutes | |
| 🟢 Succeeded | 11 seconds | |
| 🟢 Succeeded | 22 seconds | |
| 🟢 Succeeded | 13 seconds | |
| 🟢 Succeeded | 1 minute | |
| 🟢 Succeeded | 27 seconds | |
| 🟢 Succeeded | 43 seconds | |
| 🟢 Succeeded | 5 seconds | |
| 🟢 Succeeded | 15 seconds | |
| 🟢 Succeeded | 9 seconds | |
| 🟢 Succeeded | 7 seconds | |
| 🟢 Succeeded | 8 seconds | |
| 🟢 Succeeded | 5 seconds |
Loading