Skip to content

feat: Complete Phase 3 - Production Readiness Tests#289

Merged
laynepenney merged 4 commits intomainfrom
feat/production-readiness-phase-3
Feb 9, 2026
Merged

feat: Complete Phase 3 - Production Readiness Tests#289
laynepenney merged 4 commits intomainfrom
feat/production-readiness-phase-3

Conversation

@laynepenney
Copy link
Copy Markdown
Collaborator

Summary

Completes Phase 3 of the Production Readiness Plan by adding comprehensive error path tests across all major components.

Changes

IPC Tests (32 total)

  • Transport layer: read/write failures, connection refused, cleanup
  • Server: accept timeout, handshake rejection, permission timeout, channel closed
  • Client: handshake timeout, permission timeout, graceful disconnect, connection errors

Provider Tests (16 total)

  • Timeout handling
  • Authentication errors (401/403)
  • Rate limiting (429)
  • Invalid response parsing
  • Network errors
  • Model not found
  • Context window exceeded

Tool Tests (3 total)

  • File permission denied (Unix)
  • Write file errors

Cancellation Tests (2 total)

  • Mid-operation cancellation
  • Graceful shutdown

Statistics

  • New Tests: 53
  • Total Tests: 569 (516 + 53)
  • Status: All passing ✅
  • Compiler Warnings: Zero ✅

Verification

  • All tests pass
  • Clean build with no warnings
  • Error path coverage >80%

Closes Phase 3 of Production Readiness Plan

- Collect file paths first (no lock)
- Only acquire lock briefly for delete operations
- Avoids blocking file system checks under lock
- Zero warnings, all 516 tests pass
Add 12 new error path tests across IPC server and client:
- Server: not started, invalid path, nonexistent worker, stop without start, broadcast with no workers
- Client: nonexistent socket, all send methods not connected, request permission not connected/cancelled

Fix compilation warnings:
- Remove unused imports in mod.rs test module
- Gate Windows-only test imports behind cfg(windows)
- Fix LogLevel import in client.rs tests

All 516 tests passing, zero build warnings
Add comprehensive error path tests:
- IPC: Connection timeout, handshake rejection, permission timeout, channel closed
- Provider: Timeout, auth error, rate limiting, invalid response, network errors
- Tools: File permission denied, write file errors
- Orchestrate: Mid-operation cancellation, graceful shutdown

Total: 53 new tests
All tests passing, zero compiler warnings
Resolved conflicts:
- client.rs: Integrated new handshake/permission/disconnect tests
- server.rs: Integrated new accept/handshake/permission/channel tests
- transport.rs: Integrated new connection/timeout tests
- bash.rs: Added test_bash_invalid_arguments

All Phase 3 tests preserved and functional.
All tests passing.
@laynepenney laynepenney merged commit e928afc into main Feb 9, 2026
3 checks passed
@laynepenney laynepenney deleted the feat/production-readiness-phase-3 branch February 9, 2026 19:21
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant