Skip to content

🚀 - 3.10.0 - Release v3.10.0 verification setup and compact comment workflows #665

Closed as not planned

Description

@efraespada

Release Type

Minor

Release Version

3.10.0

Changelog

Additional Context

The maintainer explicitly authorized publishing this minor after compact comment coordination, all current-head checks and complete review with no unresolved findings. Encapsulation is implemented by #662/#663 and merged into develop as f5f462b. The official sync into release/3.10.0 passed six verification gates at 4d7906e.

This is a fresh unpublished attempt replacing #661 and promotion #664. Their frozen operation 63381e09-9a3d-440d-aa28-a8efcaa85308 and source identity remain unchanged for audit. The new review found two actionable corrections: native request cleanup must never remove an unvalidated or unowned request file, and the hook SDD must distinguish consumer reusable workflows from the supported Copilot coordinator. Apply and validate these before starting a new preparation. Four other findings were resolved with primary GitHub syntax and existing lifecycle/configuration evidence. No production merge, version tag or npm publication occurred in the previous attempt.

Use the installed Action-owned release branch and official preparation, production PR, protected merge, npm trusted publication, GitHub Release, major Action ref and development reconciliation. Do not manually create/reset/force-push branches or tags, or alter the superseded durable operation. Wait for branch admission before normal contributor commits to the exact canonical ref. Freeze the corrected validated source only after these review corrections. Before merge require all applicable checks and complete current-head review with no unresolved findings. Verify publication identity across accepted production SHA, package.json, immutable v3.10.0 tag, npm version/gitHead, GitHub Release and moving v3 ref; verify registry CLI, setup starter, reconciliation and issue completion.

Activity

  1. added theissue type on Oct 22, 2026
  2. moved this to Todo in vypdevon Oct 22, 2026
  3. changed the title [-]Release v3.10.0 verification setup and compact comment workflows[/-] [+]🚀 - 3.10.0 - Release v3.10.0 verification setup and compact comment workflows[/+] on Oct 22, 2026
  4. efraespada commented on Oct 22, 2026

    @efraespada
    MemberAuthor

    The Action admitted this issue and exposed release/3.10.0. Normal fast-forward commit d33064a now addresses both actionable findings from superseded promotion #664: native request cleanup is gated on validated successful request creation, and the SDD explicitly distinguishes excluded consumer reusable hooks from the supported Copilot-owned coordinator. Three regressions reproduced deletion on the old code and now pass; existing success/failure cases also assert owned request cleanup. All 93 runner/protocol/controller/post tests passed, together with typecheck, lint, specification/catalog generation and validation, documentation/workflow checks, build, reproducible staged build validation and npm package validation. Graphify was updated locally. The previous operation remains unchanged for audit. Start a fresh official preparation only from this corrected candidate, with all current-head platform checks and complete review required before merge.

  5. added
    state:workingWork can proceed on the verified branch or without a branch.
    on Oct 22, 2026
  6. vypbot commented on Oct 22, 2026

    @vypbot
    Contributor

    ❌ Release 3.10.0

    Current status: needs attention.

    Action required

    Managed promotion PR #666 was closed without merge.. Retry after correcting the cause.

    Production updated Publication Development synchronized
    No No No

    What Copilot protected

    Production updated: No. Package status: not published.

    Progress

    • Source cut: develop@​f5f462b
    • Build and release validation + Package smoke test
    • Production promotion: master
    • Package status: not published
    • Development reconciliation: develop
    • Cleanup and issue completion
    flowchart LR
        D[Source snapshot] --> R[Version prepared]
        R --> P[Production PR]
        P --> A[Accepted in production]
        A --> N[Package and release]
        N --> B[Development reconciliation]
        B --> C[Complete]
    
    Loading

    prepared -> production PR -> accepted -> published -> reconciled -> complete

    Current transition

    From To State
    release/3.10.0 master needs attention

    Links

    Release control center · release/3.10.0 branch · f5f462b origin commit · d33064a prepared commit · Compare changes · Promotion PR #666

    Technical details
    • Operation: c8ac4e53-427a-471b-8ebb-c2577d7a9e7b
    • Strategy: production-lineage
    • PR mode: auto-merge
    • Source SHA: d33064affc66229cae37a27dd8b37dcdd27457f8
    • Production SHA: pending
  7. added and removed
    state:workingWork can proceed on the verified branch or without a branch.
    on Oct 22, 2026
  8. efraespada commented on Oct 22, 2026

    @efraespada
    MemberAuthor

    Superseded by a fresh unpublished attempt after promotion #666 review. Retain the frozen operation and source as audit evidence. The new candidate will preserve Cursor key minimization at the reusable call and clarify the remaining historical SDD sentence before preparation. Nothing has been merged to production or published.

  9. moved this from Todo to Done in vypdevon Oct 22, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Projects

  • Status
    Done

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions